changing and shower facilities reopening

changing and showers reopening

Changing and shower facilities reopening – update 20th September 2020

As part of our phased reopening plans, we are pleased to announce that limited changing facilities and showers will be available for use, post-activity, at both Worthing Leisure Centre and Splashpoint from Monday 21st September.

Please ensure you still arrive to your swim, gym or class session ready to take part – ‘beach ready’ for swim sessions or dressed in appropriate leisure wear for exercise sessions. There will then be limited access to showers and changing facilities, should you need to use them, after your session(s).

On poolside at Splashpoint, only the pre-swim showers will be available for a post-swim rinse, not the shower cubicles, and as such shampoos and shower gels are currently still not permitted for use on poolside. 

Changing facilities will not be available before your session (excluding Parent & Baby swim sessions) and lockers on poolside are still unavailable at this time, however there will be limited locker access in the dry side changing rooms.